The 21-Day Throughput Fix

Your floor is full. Your profits aren't. We fix that In 21 Days.

No new machines. No new hires. Measurable results in 21 days — or we keep working.

Lead times cut by up to 75% Profitability up to 6× 95%+ on-time delivery
📞 Book Your Free 20-Min Diagnostic Call
75% Lead Time Reduction
6× Profitability Increase
95% On-Time Delivery
21Days to Results
Sound Familiar?

Your Factory Looks Busy. But the Numbers Don't Move.

Most factory owners think the problem is capacity. They invest in new machines, hire more staff, work longer hours — and still fall short. The real problem is hidden.

  • Orders are late despite full production
  • Lead times keep increasing
  • Cash is stuck in unfinished work (WIP)
  • You're considering new machines or hiring
  • Your team is exhausted but output doesn't grow
The problem is not capacity. It's how work flows through your system. A busy floor does NOT mean a productive system.
The Big Idea

It's Not a Capacity Problem. It's a Flow Problem.

Most factories optimize for machine efficiency — not for output. This creates constraints, wrong priorities, and work stuck in queues. The fix is not more resources. It's smarter flow.

❌ Old Thinking

  • Keep every machine busy
  • Measure local efficiency
  • Add capacity to grow
  • Bigger batches = cheaper

✅ Flow Thinking

  • Make sure your most critical machine never stays unnecessarily idle
  • Measure system throughput
  • Unlock the hidden capacity you've already paid for
  • Faster flow = more profit
The Solution

The 21-Day Throughput Fix

A focused, remote engagement that identifies and eliminates what's limiting your output — with measurable results within 21 days.

1

Diagnose the Real Constraint

We map your production flow and pinpoint the exact constraint holding your output back.

2

Redesign Flow & Priorities

We restructure work sequencing so your revenue-limiting resource is always fed and never starved.

3

Implement New Production Rules

Simple, practical rules your team can follow immediately — no software needed.

4

Measurable Results in 21 Days

Track real improvements in throughput, lead time, and on-time delivery from day one.

🚫 No New Machines 🚫 No New Hires 🚫 No Long Projects ✅ 100% Remote
Guarantee 🛡️

No Results? I Keep Working — Until You Do.

If we do not deliver a measurable improvement in your key throughput metric within 21 days, I continue working at no extra cost until we do. This is a real performance guarantee — not a vague promise.

  • Measurable throughput improvement in 21 days
  • No additional cost until outcomes are delivered
  • Personal expert focus on your factory's constraint

Limited Availability

I work with a maximum of two clients at a time so every engagement receives the full attention needed to generate rapid, reliable results.

Check Availability
Proven Results

Real Factories. Real Numbers.

Every result below is from a real engagement. These are not estimates — they are what actually happened.

An 11-site manufacturer was preparing a major expansion to hit its valuation target. The capacity was already there — hidden inside how the floor was being managed.

Air Ventilation

Manufacturer

Lead Time16 weeks → 4 weeks
Productivity increase
EBITDA increase

This company was losing 9 out of 10 sales opportunities. Good product. Fair price. The problem wasn't what they were selling — it was that they couldn't promise when it would arrive.

Steel Components

Manufacturer

On-Time Delivery30% → 97%
Profitability8% → 32%
Win Rate<10% → 40%+

They had tried scheduling software, ERP systems, extra shifts, extra equipment, and multiple consultants over several years. Nothing had worked. OTIF delivery was still 35%.

Medical Devices

Manufacturer

Production WaitEliminated (0)
On-Time Delivery35% → 95%
Results Sustained13+ years

The owner demanded growth. The CEO's plan required new machines and a broader product range. Neither turned out to be necessary.

Kitchen Cabinets

Manufacturer

Lead Time8 weeks → 2 weeks
Reliability63% → 98%
Profitability in 6 months

This company had been stuck at €50M revenue and 2% profit for over ten years. The leadership team blamed the market. The real cause was on the floor — and in the sales pipeline.

PCB Manufacturer

Electronics

Revenue€50M → €80M
Profit Margin2% → 20%
OTIF5% → 95%
Common Objection

"But We Need to Invest to Grow."

Every single client thought the same thing before we started. In multiple cases, CapEx investment plans were cancelled after the engagement — because the capacity was already there. Hidden inside poor flow.

The results came from fixing the system — not adding to it.

€0New machines required
€0New hires required
21Days to results
Free Diagnostic Call

Find Out What's Really Limiting Your Output

Book your free 20-minute diagnostic call. We'll review your production flow, identify if you have a real capacity issue, and give you a clear answer — no obligation.

"If it's a management problem — I can fix it in 21 days."

  • 20-minute call, completely free
  • No sales pitch — just honest diagnosis
  • You'll know exactly what's limiting you

Your floor is full. Your profits aren't. That changes in 21 days.

Book your free 20-minute diagnostic call. No obligation — just a clear, honest answer about what is limiting your output.

📞 Book Your Free Diagnostic Call